What It Takes to Engineer ERP Data for Reliable LLM Answers

How data engineering connects ERP transactions, business rules, and reporting logic so teams can verify the answers an AI assistant gives them.

‍

“Which orders are at risk of shipping late this week?”

An operations planner knows where to look. She checks the confirmed ship date, sees what has already shipped, and looks at whether stock is allocated to cover the remaining quantity. If the inventory feed is behind, she knows which numbers to check before escalating an order.

A large language model (LLM) can interpret the same question. To answer it reliably, the assistant needs access to the records and logic the planner uses. That means connecting data from enterprise resource planning (ERP) and fulfillment systems, preserving the relationships between transactions, and implementing an agreed definition of what counts as at risk.

The work starts with the data model.
‍

Model the process the question refers to

A sales order line can have several shipment records and several inventory reservations. Each represents a different event. If an order line is joined directly to both sets of records, the same shipment or reservation can appear more than once. The query may run successfully and still overstate how much has shipped or how much stock has been allocated.

Consider an order line for 100 units. Thirty shipped on Monday and 40 on Tuesday. The reporting model needs to count each shipment once and calculate the 30 units still open. If those units will ship from two warehouses, the model may also need to preserve which warehouse is responsible for each quantity. Otherwise, stock allocated at one location could appear to cover an order that has to ship from another.

These decisions determine what the assistant can answer. A dataset built for a weekly shipment summary may be perfectly adequate for reporting volume and still lack the detail a planner needs to investigate an individual order.
‍

Translate business definitions into logic the LLM can use

The phrase at risk does real work in the planner’s question. A requested ship date may differ from a confirmed one. Stock on hand may already be committed elsewhere. The meaning of this week may depend on the location’s business calendar.

Suppose operations agrees to flag an open order line when its confirmed ship date falls within the next two business days and its remaining quantity exceeds the stock allocated to it. Data engineers can implement that rule in a reporting view, semantic model, or data service. The rule then has a defined date field, a business calendar, and a calculation that can be reviewed with the people who use it.

The LLM can interpret the request, resolve the time window and location, and call the approved calculation. The data platform determines which records qualify. The assistant can explain why each order was flagged. If a follow-up requires generated SQL, reviewed relationships and business definitions give the model the context to compose a query the system can validate before execution.
‍

Preserve when the data was true

Order and shipment records might refresh hourly while inventory allocations arrive overnight. At 3 p.m., the latest shipment activity may be available alongside an allocation position from the previous night. Combining them can produce a plausible risk list based on two different points in time.

Data engineering makes that timing visible. The pipeline can retain source timestamps, track when each feed last loaded, and apply the freshness rules the workflow requires. If allocation data falls outside that window, the assistant can explain that the risk list reflects the last available allocation snapshot. The planner can then decide which orders need an inventory check before acting.

The same principle applies to access. If a planner is authorized to see two distribution centers, the query should enforce that scope, and the answer should identify the locations it covers.
‍

Test the answer at the level people act on

Start with one fulfillment location and the exception report operations already uses. Run both against the same reporting window and data snapshot. Compare the order lines that qualify, the quantities still open, and the reasons each line was flagged. Two lists can contain the same number of orders and send planners to investigate different ones.

Then test what happens when an order ships in parts, a confirmed date changes, or an inventory reservation moves to another order. Each case should have an expected result that operations and data engineering can verify. If the assistant flags the wrong order, those tests help the team trace the error to a source record, a relationship, a business rule, or the way the assistant interpreted the question.

Once that logic is modeled and tested, the same calculation can serve an exception dashboard, a planning workflow, and an LLM assistant. When a planner asks why an order was flagged, each can point back to the same commitment, shipment activity, and allocation records.

That is where RandomTrees’ data engineering work begins, with a business question, the systems that hold the evidence, and a result the team can independently verify. Explore RandomTrees’ Data Engineering services